Here are some common issues faced by our retail clients:
1. Power Availability Constraints
- The UK is facing severe connectivity challenges, with around 400 gigawatts of projects awaiting connection to the national grid. Some projects face delays of 10-15 years.
- We help our retail clients by conducting early assessments at the portfolio level to determine available power, estimated connection costs, reinforcement timelines, and the feasibility of interim loads.
2. Complexity of the Process
- DNO Processes: Each Distribution Network Operator (DNO) follows its own Point of Connection (POC) process, adding complexity to grid connections. At ESP, we have a dedicated team of specialists who manage all POC requirements, navigate the complex DNO processes, and ensure all milestones are tracked.
- Land Rights: DNO land rights requirements differ by region, with varying criteria for securing land access. Our in-house legal team specializes in securing land rights for both HV and LV connections, using pre-agreed documentation with each DNO to streamline the process.
- Technical and Design Standards: Every site has unique technical factors, including regional DNO requirements, load, and fault levels. We handle the NERS-accredited design process early on to mitigate time and cost risks.
3. Construction Delays
- Choosing the right contractors is critical to avoid costly delays. We assist retail CPOs in defining clear scopes for Independent Connection Provider (ICP) works, ensuring confidence in like-for-like costs and minimizing unexpected variations.